• 2010 Annual Conference
  • Alliance Newsletter
  • Calendar
  • News Updates
  • Past Conferences
  • Training
  • Apprentice Training
  • E-Learning Training
  • Hazard Hamlet Teaching
  • Hometown Connections
  • Legislative Services
  • Monthly Safety Meeting Program
  • Municipal Finance Program
  • Mutual Aid Program
  • Safety Training DVD Library
  • Thermography Inspection
  • Municipal Members
  • Associate Members
  • Energy Associates
  • Join Us
  • About MPUA
  • Awards
  • Committees
  • Contact MPUA
  • Employment
  • Leadership
  • Staff
  • Energy Efficiency
  • Legal and Regulatory
  • Media Kits
  • Newspaper and Other Sources
  • Ordinances
  • Other Agencies
  • Resources Home
logo

Serving Municipal Utilities

button_search
 
 
  • Home
  • News & Events
  • Services
  • Members
  • About Us
  • Resources
  • Association
  • Electric
  • Gas
  • Water
 

MJMEUC Power Projects

 

Iatan 2

The Iatan Power Station, just outside of Weston, MO, currently consists of a single 670 MW (net) unit that was placed in service in 1980. The second unit at the site, Unit 2, will generate 850 MW (net)  utilizing a single supercritical, pulverized coal-fired boiler of balanced draft combustion design and a single reheat steam turbine.

Iatan 2 Project

 

 

Laddonia

The Laddonia combined heat and power (CHP) system is the first generation project owned by MJMEUC to go into operation.  In 2005, a MJMEUC/POET Biorefining partnership was established to take advantage of the mutual benefit each entity had in utilizing a CHP project at POET's ethanol plant in Laddonia.

Laddonia Project

 

 

Loess Hills Wind Farm

Loess Hills Wind Farm, located in Rock Port, Missouri which began operation in March, 2008.  The energy from this farm is entirely for the members of MoPEP and the city of Rock Port. It began operation in March 2008.  

Loess Hills Project

 

 

Nebraska City 2

Nebraska City 2 is the 660-megawatt generating unit that Omaha Public Power District (OPPD) constructed adjacent to its Nebraska City Station Unit 1. The unit began commercial production of electricity in May 2009.  

Nebraska City 2 Project

 

 

Plum Point 1

The Plum Point 1 project consists of a 665 MW (net) coal-fired generating facility being built at a site that is a few miles south of the City of Osceola, Arkansas. 

Plum Point 1 Project

 

 

 

Prairie State Energy Campus

The Prairie State Energy Campus includes a 1,600 MW (net) coal-fired, steam-electric generating station utilizing state-of-the-art pulverized coal supercritical boiler technology. Prairie State is located adjacent to underground coal reserves that are expected to supply all the fuel needs for the site for approximately 30 years.

Prairie State Project

 

 

 

 


 

MJMEUC

  • MJMEUC Electric Commission
  • MJMEUC Financials and Reports
  • Hazard Hamlet Teaching
  • Apprentice Training
  • MJMEUC Members
  • Power Projects Overview
  • Safety Training DVD Library
  • Mutual Aid Program
  • E-Learning Training
  • Links - Electric
  • HAPS - RICE

Organizations

  • MJMEUC Electric Commission
  • MoPEP Public Energy Pool
  • MAMU Utilities Association
  • MGCM Gas Commission
  • MPWC Public Water Council

News and Announcements

Missouri Municipals Prominently Featured in National Association Video

July 6th, 2010


Calendar and Events

9/12

MML Conference - Sept. 12-15, 2010
St. Charles, MO

9/30

JOC/Executive Committee Meetings held in conjunction with Annual Conference
Tan-Tar-A, Lake of the Ozarks, MO

9/30

Member Services Committee - held in conjunction with Annual Conference
Tan-Tar-A, Lake of the Ozarks, MO

10/01

MJMEUC/MAMU/MGCM Board of Directors Meetings - held in conjunction with Annual Conference
Tan-Tar-A, Lake of the Ozarks, MO

10/03

Public Natural Gas Week



 